Upper Level Refresh

Primary bathroom soaking tub under a large window.
Primary bathroom double sink vanity.
Primary bathroom looking toward the shower, toilet closet door, and built-in storage cabinet.
Large walk-through closet with white cabinets, carpet, and a chandelier above.
Large walk-through closet with white cabinets, carpet, and a chandelier above.
Primary bedroom with vaulted ceilings and a fireplace looking toward the door to the hallway and the door to the closet.
Large primary bedroom with vaulted ceilings, a fireplace, and built-in window seat.
Laundry room with machines under the window and cabinets along the interior wall.
Bathroom with a double vanity and window looking toward the mountains.
Thumbnail of http://Primary%20bathroom%20soaking%20tub%20under%20a%20large%20window.
Thumbnail of http://Primary%20bathroom%20double%20sink%20vanity.
Thumbnail of http://Primary%20bathroom%20looking%20toward%20the%20shower,%20toilet%20closet%20door,%20and%20built-in%20storage%20cabinet.
Thumbnail of http://Large%20walk-through%20closet%20with%20white%20cabinets,%20carpet,%20and%20a%20chandelier%20above.
Thumbnail of http://Large%20walk-through%20closet%20with%20white%20cabinets,%20carpet,%20and%20a%20chandelier%20above.
Thumbnail of http://Primary%20bedroom%20with%20vaulted%20ceilings%20and%20a%20fireplace%20looking%20toward%20the%20door%20to%20the%20hallway%20and%20the%20door%20to%20the%20closet.
Thumbnail of http://Large%20primary%20bedroom%20with%20vaulted%20ceilings,%20a%20fireplace,%20and%20built-in%20window%20seat.
Thumbnail of http://Laundry%20room%20with%20machines%20under%20the%20window%20and%20cabinets%20along%20the%20interior%20wall.
Thumbnail of http://Bathroom%20with%20a%20double%20vanity%20and%20window%20looking%20toward%20the%20mountains.

Before

Bathroom before the remodel with a shower, tub, and carpet on the floor.

The Upper Level Refresh project included reconfiguring the primary suite layout and updating the hallway bathroom and laundry room. In the primary suite, we reduced the size of the bedroom in order to make a more proportional bedroom and gain additional space for a large walk-through closet. We then designed the layout in the primary bathroom to include a walk-in shower, water closet, soaking tub, and double vanity. Down the hall, we updated the laundry room and hallway bathroom with new finishes that tie in with the design in the primary suite.

Project Team:
Contractor: David Child, Solid Renovation Company
Interior Designer: Niki Volle, NV Design
Photographer: Baylee Child, Solid Renovation Company

Style:  1980’s
Areas Renovated:  Second Story