The electrical systems of today’s houses have come a long way. Whole house computerized systems are available to provide sophisticated options to control all the lights inside and outside the house
Once the sheathing and waterproofing is applied to the framing and the plywood sheathing and waterproofing is applied over the roof trusses, the final step to enclosing the house is to add the doors and windows. At that point, the
After the walls of the home are framed, it is time to add the roof. Today most residential roofs are created with pre-manufactured trusses. This is the fastest and most economical method of creating a pitched roof. If you are
Once the concrete work is finished on a house—the footings, foundation walls, and floor slabs—it is time to bring in some other materials. The plumber and heating subcontractors have already been on site to install pipes and ductwork that is
An important step in keeping a home warm and dry is to waterproof the exterior of the concrete foundation walls before they are backfilled (when the dirt is piled up against the exterior of the walls). In the planning stage
Once the hole has been dug for a new home, we begin filling it up again –this time with concrete and steel to create the engineered footings and foundation walls which will hold up the new structure. The process for